Office Conversion

Project Info

Having won the plumbing and heating contract as with all London based jobs we had a lot of live lead pipework to decommission but with our specialist team it proved no problem. We discovered a  11/4″ black iron one pipe heating system that was showing signs of leaking and with a severe rust problem, we have replaced the whole system with new iron in the traditional way with hemp and cut on site with our threading machine. With our expert team getting each section back working on the same day so no disruption was made to the other 20 apartments.

Working with a leading interior design team and under instruction from a top local builder, we are currently working to ensure the luxury apartment has all the features the client requires and are having constant meetings to ensure the expectations of all parties are surpassed.